Where North Carolina's power comes from
Your supplier is your utility. Find yours below to see what its power is made of, or look up your ZIP code on the map.
56 suppliers · 1,081 ZIP codes
- Solar
- Wind
- Biomass
- Large hydro
- Nuclear
- Natural gas
- Coal
- Oil and other
- Unspecified
Duke Energy Carolinas 302 ZIP codes
Its power is 47% nuclear, 28% natural gas, 11% unspecified power, and 10% coal. From the fuel mix it discloses.
The plants behind it
- McGuire Nuclear, 24 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 138 miles of power line away
- Buck Natural gas, 16 miles of power line away
See them on the map, hour by hour
302 ZIP codes
27012 27016 27019 27045 27051 27052 27094 27098 27099 27101 27102 27103 27104 27105 27106 27107 27108 27109 27110 27111 27113 27114 27115 27116 27117 27120 27127 27130 27150 27152 27155 27157 27198 27199 27201 27202 27214 27215 27216 27217 27230 27233 27244 27249 27253 27258 27263 27283 27284 27285 27288 27289 27301 27310 27311 27313 27315 27320 27323 27326 27340 27342 27349 27350 27358 27359 27360 27370 27373 27375 27377 27401 27402 27403 27404 27405 27406 27407 27408 27409 27410 27411 27412 27413 27415 27416 27417 27419 27420 27425 27427 27429 27435 27438 27455 27495 27497 27498 27499 27509 27510 27514 27515 27516 27517 27560 27599 27701 27702 27703 27704 27705 27706 27707 27708 27709 27710 27711 27712 27713 27715 27717 27722 28009 28012 28017 28018 28019 28023 28024 28032 28038 28039 28040 28041 28042 28043 28071 28072 28073 28074 28075 28076 28081 28083 28089 28090 28098 28101 28103 28105 28106 28114 28120 28124 28126 28128 28130 28136 28138 28139 28144 28145 28146 28147 28150 28151 28152 28159 28160 28169 28201 28202 28203 28204 28205 28206 28207 28208 28209 28210 28211 28212 28213 28214 28215 28216 28217 28218 28219 28220 28221 28222 28223 28224 28226 28228 28229 28230 28231 28232 28233 28234 28235 28236 28237 28241 28242 28243 28244 28246 28247 28250 28253 28254 28255 28256 28258 28260 28262 28263 28265 28266 28269 28270 28271 28272 28273 28274 28275 28277 28278 28280 28281 28282 28284 28285 28287 28288 28289 28290 28296 28297 28299 28601 28602 28603 28610 28612 28613 28624 28637 28650 28658 28666 28671 28690 28697 28702 28710 28712 28713 28717 28718 28719 28720 28723 28724 28725 28726 28727 28729 28731 28732 28733 28734 28735 28736 28739 28742 28744 28758 28759 28760 28762 28763 28766 28768 28771 28773 28779 28781 28784 28788 28789 28790 28791 28792 28793 28901 28904 28909
Duke Energy Progress 195 ZIP codes
Its power is 41% nuclear, 34% natural gas, 11% coal, and 9% sunlight. From the fuel mix it discloses.
The plants behind it
- Harris Nuclear, 14 miles of power line away
- Greensville County Power Station (VA) Natural gas, 135 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 94 miles of power line away
See them on the map, hour by hour
195 ZIP codes
27209 27212 27228 27229 27237 27312 27330 27331 27376 27379 27501 27504 27506 27508 27511 27512 27513 27518 27519 27520 27521 27523 27524 27526 27527 27528 27529 27530 27532 27534 27536 27537 27539 27540 27542 27543 27545 27549 27553 27555 27556 27562 27563 27568 27569 27570 27576 27577 27581 27584 27591 27592 27593 27601 27602 27603 27604 27605 27606 27607 27608 27609 27610 27611 27612 27613 27615 27617 27619 27620 27621 27622 27623 27624 27625 27626 27627 27628 27629 27634 27635 27636 27640 27650 27656 27658 27661 27668 27675 27676 27690 27695 27697 27698 27699 27807 27809 27812 27816 27822 27829 27837 27842 27850 27851 27856 27868 27873 27879 27880 27882 27883 27884 27891 28308 28315 28328 28329 28348 28370 28373 28374 28387 28390 28401 28402 28403 28404 28405 28406 28407 28408 28409 28410 28411 28412 28423 28428 28429 28436 28443 28449 28451 28456 28480 28503 28504 28512 28513 28518 28519 28520 28523 28524 28525 28530 28560 28563 28564 28573 28577 28579 28581 28586 28589 28664 28701 28704 28707 28709 28711 28715 28728 28730 28738 28748 28757 28765 28770 28776 28777 28778 28786 28787 28801 28802 28803 28804 28805 28806 28810 28813 28814 28815 28816
EnergyUnited 49 ZIP codes
Its power is 60% natural gas, 30% nuclear, 8% coal, and 3% sunlight. From the fuel mix it discloses.
The plants behind it
- McGuire Nuclear, 56 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 170 miles of power line away
- Buck Natural gas, 59 miles of power line away
See them on the map, hour by hour
49 ZIP codes
27006 27009 27013 27014 27022 27025 27027 27028 27042 27046 27048 27054 27235 27239 27261 27264 27292 27293 27294 27295 27299 27351 27357 27361 27374 28006 28035 28036 28037 28115 28117 28123 28125 28164 28166 28606 28609 28625 28634 28636 28654 28660 28673 28678 28681 28682 28688 28689 28699
Dominion North Carolina 43 ZIP codes
Its grid runs on 41% natural gas, 31% nuclear, 17% coal, and 4% wind. It publishes no fuel mix, so this is its grid area's mix over the last year.
The plants behind it
- Surry (VA) Nuclear, 77 miles of power line away
- Greensville County Power Station (VA) Natural gas, 129 miles of power line away
- Tenaska Virginia Generating Station (VA) Natural gas, 199 miles of power line away
Blue Ridge Energy 32 ZIP codes
Its grid runs on 50% nuclear, 26% natural gas, 20% coal, and 2% sunlight. It publishes no fuel mix, so this is its grid area's mix over the last year.
The plants behind it
- McGuire Nuclear, 87 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 201 miles of power line away
- Gavin Power (OH) Coal, 276 miles of power line away
Surry-Yadkin EMC 32 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- McGuire Nuclear, 68 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 182 miles of power line away
- Buck Natural gas, 115 miles of power line away
Tideland EMC 27 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- Brunswick Nuclear Nuclear, 154 miles of power line away
- Greensville County Power Station (VA) Natural gas, 176 miles of power line away
- Lee Combined Cycle Plant Natural gas, 110 miles of power line away
Roanoke Electric Cooperative 24 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- Surry (VA) Nuclear, 84 miles of power line away
- Greensville County Power Station (VA) Natural gas, 66 miles of power line away
- Tenaska Virginia Generating Station (VA) Natural gas, 207 miles of power line away
Brunswick EMC 23 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- Vogtle (GA) Nuclear, 254 miles of power line away
- Greensville County Power Station (VA) Natural gas, 322 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 155 miles of power line away
Four County EMC 23 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- Brunswick Nuclear Nuclear, 55 miles of power line away
- Greensville County Power Station (VA) Natural gas, 203 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 105 miles of power line away
Rutherford EMC 22 ZIP codes
Its grid runs on 50% nuclear, 26% natural gas, 20% coal, and 2% sunlight. It publishes no fuel mix, so this is its grid area's mix over the last year.
The plants behind it
- Catawba (SC) Nuclear, 58 miles of power line away
- Jack McDonough (GA) Natural gas, 236 miles of power line away
- Bowen (GA) Coal, 263 miles of power line away
South River EMC 19 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- Harris Nuclear, 41 miles of power line away
- Greensville County Power Station (VA) Natural gas, 141 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 82 miles of power line away
Jones-Onslow EMC 18 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- Brunswick Nuclear Nuclear, 81 miles of power line away
- Greensville County Power Station (VA) Natural gas, 220 miles of power line away
- Lee Combined Cycle Plant Natural gas, 95 miles of power line away
Lumbee River EMC 18 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- Brunswick Nuclear Nuclear, 92 miles of power line away
- Greensville County Power Station (VA) Natural gas, 212 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 37 miles of power line away
Pee Dee EMC 17 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- Catawba (SC) Nuclear, 97 miles of power line away
- Jack McDonough (GA) Natural gas, 320 miles of power line away
- Greensville County Power Station (VA) Natural gas, 223 miles of power line away
Randolph EMC 17 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- McGuire Nuclear, 123 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 63 miles of power line away
- Buck Natural gas, 80 miles of power line away
Union Power Cooperative 16 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- McGuire Nuclear, 53 miles of power line away
- Jack McDonough (GA) Natural gas, 294 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 60 miles of power line away
Central EMC 15 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- Harris Nuclear, 27 miles of power line away
- Greensville County Power Station (VA) Natural gas, 148 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 70 miles of power line away
Piedmont EMC 14 ZIP codes
Its grid runs on 50% nuclear, 26% natural gas, 20% coal, and 2% sunlight. It publishes no fuel mix, so this is its grid area's mix over the last year.
The plants behind it
- McGuire Nuclear, 145 miles of power line away
- Greensville County Power Station (VA) Natural gas, 160 miles of power line away
- Gavin Power (OH) Coal, 443 miles of power line away
Carteret-Craven EMC 12 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- Brunswick Nuclear Nuclear, 131 miles of power line away
- Greensville County Power Station (VA) Natural gas, 228 miles of power line away
- Lee Combined Cycle Plant Natural gas, 103 miles of power line away
Haywood EMC 12 ZIP codes
Its grid runs on 50% nuclear, 26% natural gas, 20% coal, and 2% sunlight. It publishes no fuel mix, so this is its grid area's mix over the last year.
The plants behind it
- Oconee (SC) Nuclear, 56 miles of power line away
- Jack McDonough (GA) Natural gas, 177 miles of power line away
- James H Miller Jr (AL) Coal, 470 miles of power line away
Tri-County EMC 12 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- Brunswick Nuclear Nuclear, 111 miles of power line away
- Greensville County Power Station (VA) Natural gas, 135 miles of power line away
- Lee Combined Cycle Plant Natural gas, 11 miles of power line away
Wake EMC 12 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- Harris Nuclear, 44 miles of power line away
- Greensville County Power Station (VA) Natural gas, 115 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 152 miles of power line away
Edgecombe-Martin County EMC 11 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- North Anna (VA) Nuclear, 192 miles of power line away
- Greensville County Power Station (VA) Natural gas, 85 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 207 miles of power line away
Fayetteville PWC 10 ZIP codes
Its power is 41% nuclear, 34% natural gas, 11% coal, and 9% sunlight. From the fuel mix it discloses.
The plants behind it
- Harris Nuclear, 40 miles of power line away
- Greensville County Power Station (VA) Natural gas, 158 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 68 miles of power line away
Mountain Electric Cooperative 10 ZIP codes
Its power is 35% natural gas, 33% nuclear, 18% coal, and 10% hydropower. From the fuel mix it discloses.
The plants behind it
- Watts Bar Nuclear Plant (TN) Nuclear, 230 miles of power line away
- Jack McDonough (GA) Natural gas, 387 miles of power line away
- Hanging Rock Energy Facility (OH) Natural gas, 247 miles of power line away
Albemarle EMC 9 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- Surry (VA) Nuclear, 74 miles of power line away
- Greensville County Power Station (VA) Natural gas, 126 miles of power line away
- Tenaska Virginia Generating Station (VA) Natural gas, 196 miles of power line away
Halifax EMC 8 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- North Anna (VA) Nuclear, 164 miles of power line away
- Greensville County Power Station (VA) Natural gas, 58 miles of power line away
- Lee Combined Cycle Plant Natural gas, 116 miles of power line away
Cape Hatteras EMC 7 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- North Anna (VA) Nuclear, 285 miles of power line away
- Greensville County Power Station (VA) Natural gas, 236 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 448 miles of power line away
French Broad EMC 7 ZIP codes
Its grid runs on 45% nuclear, 22% natural gas, 15% coal, and 8% sunlight. It publishes no fuel mix, so this is its grid area's mix over the last year.
The plants behind it
- Vogtle (GA) Nuclear, 241 miles of power line away
- Jack McDonough (GA) Natural gas, 248 miles of power line away
- James H Miller Jr (AL) Coal, 433 miles of power line away
Greenville Utilities Commission 6 ZIP codes
Its power is 41% nuclear, 34% natural gas, 11% coal, and 9% sunlight. From the fuel mix it discloses.
The plants behind it
- Brunswick Nuclear Nuclear, 178 miles of power line away
- Greensville County Power Station (VA) Natural gas, 115 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 194 miles of power line away
Pitt and Greene EMC 6 ZIP codes
Its power is 50% nuclear, 29% natural gas, 9% unspecified power, and 5% sunlight. From the fuel mix it discloses.
The plants behind it
- Brunswick Nuclear Nuclear, 153 miles of power line away
- Greensville County Power Station (VA) Natural gas, 165 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 202 miles of power line away
City of Gastonia 5 ZIP codes
Its power is 93% nuclear, 6% natural gas, and 1% sunlight. From the fuel mix it discloses.
The plants behind it
- McGuire Nuclear, 17 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 108 miles of power line away
- Kings Mountain Energy Center Natural gas, 24 miles of power line away
City of High Point 5 ZIP codes
Its power is 93% nuclear, 6% natural gas, and 1% sunlight. From the fuel mix it discloses.
The plants behind it
- McGuire Nuclear, 75 miles of power line away
- Buck Natural gas, 32 miles of power line away
- Belews Creek Natural gas, 39 miles of power line away
City of Rocky Mount 4 ZIP codes
Its power is 41% nuclear, 34% natural gas, 11% coal, and 9% sunlight. From the fuel mix it discloses.
The plants behind it
- Harris Nuclear, 87 miles of power line away
- Greensville County Power Station (VA) Natural gas, 74 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 178 miles of power line away
City of Wilson 4 ZIP codes
Its power is 41% nuclear, 34% natural gas, 11% coal, and 9% sunlight. From the fuel mix it discloses.
The plants behind it
- Harris Nuclear, 76 miles of power line away
- Greensville County Power Station (VA) Natural gas, 87 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 167 miles of power line away
Concord Board of Light and Water 4 ZIP codes
Its grid runs on 50% nuclear, 26% natural gas, 20% coal, and 2% sunlight. It publishes no fuel mix, so this is its grid area's mix over the last year.
The plants behind it
- McGuire Nuclear, 25 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 135 miles of power line away
- Cross (SC) Coal, 193 miles of power line away
Murphy Electric Power Board 4 ZIP codes
Its power is 35% natural gas, 33% nuclear, 18% coal, and 10% hydropower. From the fuel mix it discloses.
The plants behind it
- Watts Bar Nuclear Plant (TN) Nuclear, 86 miles of power line away
- Jack McDonough (GA) Natural gas, 174 miles of power line away
- James H Miller Jr (AL) Coal, 264 miles of power line away
City of Statesville 3 ZIP codes
Its power is 93% nuclear, 6% natural gas, and 1% sunlight. From the fuel mix it discloses.
The plants behind it
- McGuire Nuclear, 41 miles of power line away
- Buck Natural gas, 56 miles of power line away
- Rowan Natural gas, 39 miles of power line away
City of Albemarle 2 ZIP codes
Its power is 93% nuclear, 6% natural gas, and 1% sunlight. From the fuel mix it discloses.
The plants behind it
- McGuire Nuclear, 51 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 58 miles of power line away
- Buck Natural gas, 29 miles of power line away
City of Kinston 2 ZIP codes
Its power is 41% nuclear, 34% natural gas, 11% coal, and 9% sunlight. From the fuel mix it discloses.
The plants behind it
- Brunswick Nuclear Nuclear, 141 miles of power line away
- Greensville County Power Station (VA) Natural gas, 160 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 196 miles of power line away
City of Laurinburg 2 ZIP codes
Its power is 41% nuclear, 34% natural gas, 11% coal, and 9% sunlight. From the fuel mix it discloses.
The plants behind it
- Catawba (SC) Nuclear, 105 miles of power line away
- Greensville County Power Station (VA) Natural gas, 231 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 19 miles of power line away
City of New Bern 2 ZIP codes
Its power is 41% nuclear, 34% natural gas, 11% coal, and 9% sunlight. From the fuel mix it discloses.
The plants behind it
- Brunswick Nuclear Nuclear, 111 miles of power line away
- Greensville County Power Station (VA) Natural gas, 191 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 227 miles of power line away
Lumberton Electric Utilities 2 ZIP codes
Its power is 41% nuclear, 34% natural gas, 11% coal, and 9% sunlight. From the fuel mix it discloses.
The plants behind it
- Brunswick Nuclear Nuclear, 81 miles of power line away
- Greensville County Power Station (VA) Natural gas, 201 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 61 miles of power line away
Town of Huntersville 2 ZIP codes
Its power is 93% nuclear, 6% natural gas, and 1% sunlight. From the fuel mix it discloses.
The plants behind it
- McGuire Nuclear, 12 miles of power line away
- Buck Natural gas, 54 miles of power line away
- Rowan Natural gas, 37 miles of power line away
Town of Wake Forest 2 ZIP codes
Its power is 41% nuclear, 34% natural gas, 11% coal, and 9% sunlight. From the fuel mix it discloses.
The plants behind it
- Harris Nuclear, 41 miles of power line away
- Greensville County Power Station (VA) Natural gas, 112 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 149 miles of power line away
City of Cherryville 1 ZIP code
Its power is 93% nuclear, 6% natural gas, and 1% sunlight. From the fuel mix it discloses.
The plants behind it
- Catawba (SC) Nuclear, 35 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 121 miles of power line away
- Kings Mountain Energy Center Natural gas, 25 miles of power line away
See them on the map, hour by hour
1 ZIP code
City of Drexel 1 ZIP code
Its power is 93% nuclear, 6% natural gas, and 1% sunlight. From the fuel mix it discloses.
The plants behind it
- McGuire Nuclear, 49 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 162 miles of power line away
- Buck Natural gas, 96 miles of power line away
See them on the map, hour by hour
1 ZIP code
City of Kings Mountain 1 ZIP code
Its grid runs on 50% nuclear, 26% natural gas, 20% coal, and 2% sunlight. It publishes no fuel mix, so this is its grid area's mix over the last year.
The plants behind it
- Catawba (SC) Nuclear, 27 miles of power line away
- Cross (SC) Coal, 176 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 113 miles of power line away
See them on the map, hour by hour
1 ZIP code
Cornelius Public Works Department 1 ZIP code
Its power is 93% nuclear, 6% natural gas, and 1% sunlight. From the fuel mix it discloses.
The plants behind it
- McGuire Nuclear, 6 miles of power line away
- Buck Natural gas, 48 miles of power line away
- Rowan Natural gas, 31 miles of power line away
See them on the map, hour by hour
1 ZIP code
Landis Energy Corporation 1 ZIP code
Its power is 93% nuclear, 6% natural gas, and 1% sunlight. From the fuel mix it discloses.
The plants behind it
- McGuire Nuclear, 25 miles of power line away
- Buck Natural gas, 17 miles of power line away
- Rowan Natural gas, 23 miles of power line away
See them on the map, hour by hour
1 ZIP code
Pineville Electric 1 ZIP code
Its power is 93% nuclear, 6% natural gas, and 1% sunlight. From the fuel mix it discloses.
The plants behind it
- Catawba (SC) Nuclear, 14 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 97 miles of power line away
- Kings Mountain Energy Center Natural gas, 44 miles of power line away
See them on the map, hour by hour
1 ZIP code
Town of Apex 1 ZIP code
Its power is 41% nuclear, 34% natural gas, 11% coal, and 9% sunlight. From the fuel mix it discloses.
The plants behind it
- Harris Nuclear, 11 miles of power line away
- Greensville County Power Station (VA) Natural gas, 115 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 92 miles of power line away
See them on the map, hour by hour
1 ZIP code
Town of Black Creek 1 ZIP code
Its grid runs on 45% nuclear, 22% natural gas, 15% coal, and 8% sunlight. It publishes no fuel mix, so this is its grid area's mix over the last year.
The plants behind it
- Brunswick Nuclear Nuclear, 133 miles of power line away
- Greensville County Power Station (VA) Natural gas, 104 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 182 miles of power line away
See them on the map, hour by hour
1 ZIP code
Town of Sharpsburg 1 ZIP code
Its grid runs on 45% nuclear, 22% natural gas, 15% coal, and 8% sunlight. It publishes no fuel mix, so this is its grid area's mix over the last year.
The plants behind it
- Harris Nuclear, 77 miles of power line away
- Greensville County Power Station (VA) Natural gas, 77 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 169 miles of power line away
See them on the map, hour by hour
1 ZIP code
Town of Tarboro 1 ZIP code
Its power is 41% nuclear, 34% natural gas, 11% coal, and 9% sunlight. From the fuel mix it discloses.
The plants behind it
- North Anna (VA) Nuclear, 186 miles of power line away
- Greensville County Power Station (VA) Natural gas, 79 miles of power line away
- Sherwood H Smith Jr Energy Complex Natural gas, 201 miles of power line away
See them on the map, hour by hour